Wednesday, November 15, 2017

Take this Survey to Help Improve Safety along the Avenue

Take this Survey to Help Improve Safety along the Avenue

The City of Alexandria is implementing the Mount Vernon Complete Streets project to address recent traffic deaths and serious injuries along the Avenue, as well as safety and accessibility concerns raised by the community through the Arlandria Action Plan, Pedestrian & Bicycle Master Plan Update, and subsequent discussions with neighborhood residents and businesses.

Help identify key the safety problems and unsafe locations along Mount Vernon Avenue (from Braddock Road to Four Mile Run), as well as solutions to these problems. Please take the survey and be a part of this effort to make your neighborhood safer and more accessible for all modes!

The survey closes on November 28.

https://survey.alexandriava.gov/s3/MtVernonAveCompleteStreetsProjectSurvey


Project Background

Mount Vernon Avenue is the main street of the Arlandria and Del Ray neighborhoods, and is heavily used by pedestrians, bicyclists, transit vehicles, and automobiles. The City is implementing this project to address recent traffic deaths and serious injuries along the Avenue, as well as safety and accessibility concerns raised by the community through the Arlandria Action Plan, Pedestrian & Bicycle Master Plan Update, and subsequent discussions with neighborhood residents and businesses.

Project Considerations

  • Accessibility of sidewalks, crossings, curb ramps, and transit stops for pedestrians and people in wheelchairs
  • Safe and comfortable north-south connectivity for bicyclists
  • High utilization of parking along Mount Vernon Avenue and side streets
  • Business loading and deliveries
  • Volume and speed of traffic on both streets
  • Highly used transit corridor with Metrobus and DASH service
  • Limited sight-distances at intersections

Implementation

PHASE 1 - SHORT-TERM IMPROVEMENTS (FALL 2017)

The City of Alexandria will conduct a traffic study of intersections along the Mount Vernon Avenue corridor, between Braddock Road and Four Mile Run. The study will:
  • Identify quick, low-cost improvements that can be made to improve traffic and pedestrian signal timing, signage, and sight-distances.
  • Identify improvements that can made as part of future resurfacing and re-striping of Mount Vernon Avenue (Phase 3).
We want to hear from you! Please look at the Mount Vernon Avenue traffic count maps to see traffic and turning counts (Braddock Road to E. Oxford Avenue and E. Oxford Avenue to Four Mile Run) from Spring 2017, and take our survey to provide input on traffic safety challenges along Mount Vernon Avenue as well as possible solutions for the City to consider. The survey closes on November 28, 2017.

PHASE 2 - PEDESTRIAN IMPROVEMENTS TO TRANSIT STOPS (MID-2018 - EARLY 2019)

The City of Alexandria conducted a Pedestrian Improvements to Transit Stop Study  along the entire Mount Vernon Avenue corridor that provided recommendations to improve pedestrian access to transit.  More information can be found here: www.alexandriava.gov/93440. The goals of the study were to: 
  • Comply with federal mandate to upgrade all bus stops to current ADA compliant standards
  • Create a ADA transition plan for bus stops Del Ray and Arlandria
  • Minimize parking loss & construction costs
  • Consolidate or relocate bus stops to improve bus travel time and encourage walking and active transportation
The Department of Project Implementation is managing the design and construction of the study's recommendations. Improvements will include:
  • Consolidate bus stops to balance accessibility, pedestrian/driver safety and on-street parking.
  • Upgrade ramps and crosswalks to improve pedestrian safety along the corridor.
  • Ensure construction process minimally impacts residents, businesses, access to parking and planned events.
  • Construct bulbs similar to the existing bus bulbs at Mount Vernon Avenue and Kennedy Street (shown below)
                                                                                bus bulb2

PHASE 3 - REPAVING AND SAFETY IMPROVEMENTS (SUMMER 2019 OR SOONER)

The City of Alexandria is scheduled to resurface Mount Vernon Avenue corridor, between Braddock Road and Hume Avenue. In conjunction with resurfacing, recommendations from the traffic study (Phase 1) and Arlandria Action Plan (2002) will be implemented. Improvements may include, but are not limited, to the following:
  • Additional high visibility crosswalks
  • Shared lane markings
  • Bicycle wayfinding signage
  • Parking edgelines
  • Flexpost curb extensions at intersections

Project Contact

Please contact Ray Hayhurst, Acting Complete Streets Program Manager, at raymond.hayhurst@alexandriava.gov, if you have any questions or concerns about this project.

10 comments:

gowthunan said...

Please let me know if you’re looking for an author for your site. You have some great posts, and I think I would be a good asset
nebosh course in chennai

arusha said...

Hi there I am so thrilled I found your website, I really found you by mistake, while I was browsing on Yahoo for something else
safety course in chennai
industrial safety course in chennai

anvianu said...

Hello! This is my first visit to When I initially commented, I clicked the “Notify me when new comments are added” checkbox and now each time a comment is added I get several your blog! We are a team of volunteers and starting a new initiative in a community in the same niche.
fire and safety course in chennai
safety course in chennai

sunshineprofe said...

nebosh course in chennai
safety course in chennai
offshore safety course in chennai

daphnemohara said...

Nice post. Such a wonderful information. Thanks for sharing your post. Easy to read and understand. Keep posting.
Fire and Safety Course in Chennai
Safety Institute in Chennai
IOSH Course in Chennai
NEBOSH Safety Course in Chennai
ISO Consultants in Chennai
Electrical Safety Audit


Aparna said...

Excellent post and I liked this post. This is very impressed to me and Keep doing...
Oracle Training in Chennai
best oracle training institute in chennai
Corporate Training in Chennai
Embedded System Course Chennai
Unix Training in Chennai
Pega Training in Chennai
Excel Training in Chennai
Soft SkillsTraining in Chennai
JMeter Training in Chennai
Oracle Training in Anna Nagar

Adhuntt said...

Great blog thanks for sharing Searching for a SEO company in Chennai that can bring your brand to the top results page on Google? Look no further - Adhuntt Media, with their team of SEO experts, can make it happen that too for the best value.

Karuna said...

Nice blog thanks for sharing Is this a special day for you? Beautiful and fragrant flowers are sure to make it even more amazing of a day no doubt. This is why Karuna Nursery Gardens offers you the best rental plants in Chennai that too at drop dead prices.

Unknown said...

Excellent blog thanks for sharing Pixies Beauty Shop is unlike any of the other cosmetic shops in Chennai. With tons of exclusive imported brands to choose from and the best value, this is the best shopping destination for your personal and salon needs.

sara said...

Your articles and contents are encouraging.
safe driver dubai charges